The front awning on the church was made of aluminum. The problem was
that water was running down between siding and church wall thus causing
water damage to the front oak doors. Jeff Naville was the Project
Manager for this Project and his design for the new gable roof for the
entry way. The window displaying the dates of the church was built is
now visible from under the new gabled roof awning. |